Stone Age: Difference between revisions

From RollerCoaster Tycoon Wiki Wiki, the RollerCoaster Tycoon encyclopedia that anyone can edit.
Content added Content deleted
No edit summary
Line 3: Line 3:
|objective=To repay your loan and achieve a park value of at least $250,000.
|objective=To repay your loan and achieve a park value of at least $250,000.
|description=To thwart the highway developers and preserve the mysterious ancient stone circles, you will need to construct a Stone Age theme park and turn a profit. However, attracting visitors may pose a challenge, as the terrain is a tad inhospitable.
|description=To thwart the highway developers and preserve the mysterious ancient stone circles, you will need to construct a Stone Age theme park and turn a profit. However, attracting visitors may pose a challenge, as the terrain is a tad inhospitable.
|admission=Free
|admission=N/A
|rating=0
|rating=0
|guests=0
|guests=0
Line 11: Line 11:
|price=75
|price=75
|rides/attractions=0
|rides/attractions=0
|staff=None
|staff=0
|cash=7,000
|cash=7,000
|loan/limit=7,000 ($12,000)
|loan/limit=7,000 ($12,000)

Revision as of 19:55, 11 September 2015

Overview

A prehistoric theme park with large mountains, which can be trouble landscape to work with, can be a great source of tunnels. The rest of the map is offers to buy, but 75$ per tile is not always recommended. While the scenario is called Stone Age, the park's name is called Rocky Rambles.

Scenario Guide

The scenario guide can be found here.

Available Rides

Transport

Gentle

Roller Coaster

Thrill Rides

Water Rides

Shops and Stalls

Available Scenery

Researched Rides

Transport

Gentle Rides

Roller Coasters

Thrill Rides

Water Rides

Shops and Stalls

Researched Scenery

Other Notes

  • The park name is Rocky Rambles.
Preceded by List of scenarios in Succeeded by
Cradle of Civilization Time Twister Metropolis