Box Office
This article or section is under construction. You can help by editing it! Relevant discussion may be available on this article's discussion page. |
Scenario Description
Look out, unamusing amusement parks! A movie studio has cast you in the role of a superhero. Not for a movie, but for the daunting task of updating its aging back-lot park without ruining its pedigreed heritage. You're the producer, the director, and the star of the show. Can you deliver the blockbuster this studio wants?
Overview
Pre-built Rides
- Studio Tour (Monorail)
- Excitement Rating: 4.45 (Medium)
- Intensity Rating: 2.39 (Low)
- Nausea Rating: 0.07 (Low)
- Excitement Rating: 4.45 (Medium)
Pre-built Shops/Stalls
- Bison Burgers 01 (Bison Burgers) in the western themed area, center of the park.
- Root Beer 01 (Root Beer) in the western themed area, center of the park.
- Steakhouse 01 (Steakhouse) in the western themed area, center of the park.
Objectives
Apprentice
- VIP (Cami O). Litter tolerance: Low.
- Park rating 300 sustained for at least 1 month.
Entrepreneur
- VIP (Cami O). Breakdown Tolerance: Medium.
- Park rating 500 sustained for at least 2 months.
- Total monthly shop profit: $400.00
Tycoon
- VIP (Cami O). Wants to visit 1 coaster: excitement rating at least 7.
- Park rating 700 sustained for at least 3 months.
Scenario Guide
Remember:
|
First off, hire several janitors to deal with the phenomenal amounts of litter that are all over the park. It is recommended that you assign them all a specific patrol area as well. The quickest way to deal with cleaning the park for the Apprentice objectives is to hire three janitors and plant them right at the entrance of the park. Letting them randomly sweep will quickly clear out the entrance area of the park before Cami O. arrives to complain about what a stye it is. Your park has no amenities other than the monorail and the western-themed restaurants to start, so your first order of business after the janitors should be planting bathrooms, benches, and info booths to keep the folks happy.
Also, do NOT delete the monorail, Deleting the monorail is NOT recommended, Guests will quickly become unhappy, and in truth the rail is a quick generator of cash in the early going. (particularly if you change the ride configuration to run with two trains) Later into the game you may want to consider extending the track on the western edge of the park to add a third station in the empty area behind the oil tanker decoration. Then hire a few mechanics and assign them to specific areas for Cami O's return and build a few more shops, as well as increasing the prices on the existing ones (Guests will quickly demand food stalls, so make sure your research budget is targeted towards shops and stalls). Next, build a coaster design (if using a saved track, make sure the excitement is at least 7) and a few non-tracked rides and you should be done this place quickly. Loans can be problematic, as you are limited to 5k until you've cleared your Entrepreneur level objectives. But worry not, at least you don't have to repay them on this park.
You can also try deleting some of the buildings around the property for some cash quick cash, just try to avoid trashing the trees as this costs money, and removing the animatronic decorations around the monorail lowers its excitement and makes it less popular. Squeeze in as many little thrill/junior/gentle rides as possible on the land the buildings were on, as they are cheap rides and make a profit easily. Just make sure to have enough mechanics to cover them as this is a large park with a lot of ground to cover.
Cami O. can be very hard to please in the Tycoon level scenario. She wants to ride on a Roller Coaster with an Excitement of 7.00 or better, but she won't venture on to one with an Intensity of more than 4.00. She also will only ride a limited number of rides; so she may use up her allotment on your thrill rides even if you have a properly rated coaster available. So make sure to put your coaster near the front, surround it with scenery to keep the Excitement level up, and avoid inversions or high speeds to keep those Intensity numbers down.
Available Rides
Researched Rides
Available Scenery
Researched Scenery
Other Notes
You can there put Cami O in a lake or where is not path to go and wait. When Cami O go out from the park, she never saw litter
Preceded by | List of scenarios in | Succeeded by |
---|---|---|
Checkered Flag | RollerCoaster Tycoon 3 | Fright Night |
RollerCoaster Tycoon 3 Scenarios | |
RollerCoaster Tycoon 3 | Vanilla Hills • Goldrush! • Checkered Flag • Box Office • Fright Night • Go With the Flow • Broom Lake • Valley of Kings • Gunslinger • Ghost Town (RCT3) • A National Treasure • New Blood • Island Hopping • Cosmic Craggs • La-La Land • Mountain Rescue • The Money Pit • Paradise Island |
Soaked! | Captain Blackheart's Cove • Oasis of Fun • Lost Atlantis • Monster Lake • Fountain of Youth • World of the Sea • Treasure Island • Mountain Spring • Cast Away Get Away |
Wild! | Scrub Gardens • Ostrich Farm Plains • Egyptian Sand Dance • A Rollercoaster Odyssey • Zoo Rescue • Mine Mountain • Insect World • Rocky Coasters • Lost Land of the Dinosaurs • Tiger Forest • Raiders of the Lost Coaster • Saxon Farm |