Volcania

From RollerCoaster Tycoon Wiki Wiki, the RollerCoaster Tycoon encyclopedia that anyone can edit.
Revision as of 03:56, 20 January 2010 by fandom:rct>Lugnuts250 (just fixing the page so it's in third person)
Volcania
Objective: To finish building all 5 of the partially built roller coasters in this park, designing them to achieve an excitement rating of at least 6.70 each
Park Description: A dormant volcano is the setting of this coaster-building challenge
Theme: Desert
Size:
  • Starting Size: 400,290 ft² / 37,187 m²
  • Maximum Size: 400,290 ft² / 37,187 m²
  • Land Price: N/A
Game: RollerCoaster Tycoon Loopy Landscapes
Preceded by [[:Category:RollerCoaster Tycoon Loopy Landscapes Scenario|List of scenarios]] in Succeeded by
[[ Iceberg Islands ]] [[RollerCoaster Tycoon Loopy Landscapes]] [[ Arid Heights ]]

[[Category:RollerCoaster Tycoon Loopy Landscapes Scenario]]



Overview

Volcania is the first ever scenario with an objective of finishing the five pre-built roller coasters to have an excitement rating of 6.70 each. The next scenario to incorporate this objective is Dragons Cove.



Pre-Built Rides

The five types of pre-built roller coasters in Volcania are a Wooden Twister Roller Coaster, a Steel Roller Coaster, a Steel Wild Mouse Roller Coaster, a Suspended Roller Coaster, and an Suspended Looping Roller Coaster.

Scenario Guide

Please only use third person in the wiki.

Note: This guide may not be optimal.



First, finish the Wooden Roller Coaster. This should be the easiest one since most of it is already built. Also created some stalls and wait for the funds to grow. Second, build the Suspended Looping Coaster. One option is to finish the drop out of the station and made a diagonal lift hill along the border of the park. Add a few special track pieces and continue the track back to the station. Now you should be making a pretty stable profit from the two coasters. Third, add a few flat rides and build a large plaza area with lots of shops and stalls. Fourth, Finish the Steel Roller Coaster. It can be built almost completely underground. After this point the money should start rolling in. The fourth coaster to built is the Suspended Roller Coaster. This may be the hardest because of the lack of banked curves and subsequent high lateral G's. This roller coaster doesn't make as much money because it is on the top of the mountain. To solve this problem add some stalls there. Last, make the Wooden Crazy Rodent Roller Coaster. This is arguably the hardest to build.. It may take a few tries, but eventualy it will all be worked out.



This article or section is under construction.

You can help by editing it! Relevant discussion may be available on this article's discussion page.



Available Rides

Transport

Gentle

Roller Coasters

Thrill

Water

Shops/Stalls