Template:CreateArticleScenario: Difference between revisions
Content added Content deleted
No edit summary |
No edit summary |
||
Line 83: | Line 83: | ||
*[[Hat Stall]] (example) |
*[[Hat Stall]] (example) |
||
*[[Coffee Shop]] (example) |
*[[Coffee Shop]] (example) |
||
*[[ |
*[[Fruity Ices Stall]] (example) |
||
==Researched Scenery== |
==Researched Scenery== |
Revision as of 08:19, 9 February 2019
Overview
(Overview here)
Pre-built Rides
(List of pre-built rides and their intensity, excitement, and nausea ratings here)
Scenario Guide
Remember:
|
(Strategy guide for beating the scenario goes here)
Available Rides
Note: The rides with "(example)" added have yet to be replaced with the actually featured rides.
Transport
- Chairlift - Chairlift Cars (example)
- Miniature Railway - Steam Trains (example)
- Monorail - Small Monorail Cars, Streamlined Monorail Cars (example)
Gentle
- Bumper Cars (example)
- Car Ride (Pick-Up Trucks, Sportscars, Racing Cars, Cats) (example)
- Merry-Go-Round (example)
Roller Coasters
- Steel Mini Roller Coaster - Log Trains (example)
- Steel Roller Coaster (example)
- Wooden Roller Coaster (example)
Thrill Rides
- 3D Cinema (example)
- Scrambled Eggs (example)
Water Rides
- Boat Hire (example)
- Dinghy Slide (example)
Shops and Stalls
- Toilets (example)
- Burger Bar (example)
- Souvenir Stall (example)
Available Scenery
- Trees (example)
- Shrubs and Bushes (example)
- Gardens (example)
- Path Items (example)
- Walls and Fences (example)
Researched Rides
(Rides that need to be researched before they can be built)
Transport
Gentle
- Mini Golf (example)
- Ferris Wheel (example)
Roller Coasters
- Steel Mini Roller Coaster - Ladybird Trains (example)
- Wooden Reverser Roller Coaster (example)
- Multi-Dimension Roller Coaster (example)
Thrill Rides
- 3D Cinema (example)
- Scrambled Eggs (example)
Water Rides
- River Rapids (example)
- Splash Boats (example)
Shops and Stalls
- Hat Stall (example)
- Coffee Shop (example)
- Fruity Ices Stall (example)
Researched Scenery
(Scenery that needs to be researched before it can be built)
- Egyptian Themeing (example)
Other Notes
(Other notes about this scenario go here)