Showering Shores

From RollerCoaster Tycoon Wiki Wiki, the RollerCoaster Tycoon encyclopedia that anyone can edit.
Revision as of 13:01, 15 March 2014 by fandom:rct>John-Mahmud (Created page with "{{Infobox Scenario |pic=Placeholder.JPG |objective=Guests : 1100, by October y.3 |theme=None |start=(Starting Size) |size=(Maximum size from buying all the available land...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

The amount of rain this park gets is driving guests away. Can you help make this park more popular ?

This park is built on a beach, and a large access of water on which building rights are already acquired.

Pre-built Rides

(List of pre-built rides and their intensity, excitement, and nausea ratings here)

Scenario Guide

Remember:
  • The Scenario Guide below is only a suggested strategy for completing this scenario—it may not work for all players.
  • The General Scenario Guide and Hints and Tips articles may also provide helpful information in completing this scenario.
  • There are usually multiple strategies to successfully completing a scenario; these can be discussed on the scenario's discussion page or written down in an existing or additional section of this article.

At first, build the missing rides you have at your disposal, so the rides already present are all connected to each other. Guests hate to walk on an empty path between two rides, and you'd hate it too were you in a real park.

Then, search for all thrill & gentle rides you may receive. Place them and open them as soon as you have them.

You may search for one roller coaster, which might be the Stand-Up Twister Coaster. Build a custom design of this one, with only the station on the ground, the remaing parts of the track above water. Max capacity, max excitement rating, max admission charge, as always on a park with free entrance.

You might also consider demolishing the Roto-Drop by the end of Year 2, so that guests will keep on riding it.

The objective is, just, really easy. Keep on building, one ad campaign per year and you're good to go.


Available Rides

Transport

Gentle

Roller Coasters

Thrill Rides

Water Rides

Shops and Stalls

Available Scenery

Researched Rides

(Rides that need to be researched before they can be built)

Transport

Gentle

Roller Coasters

Thrill Rides

Water Rides

Shops and Stalls

Researched Scenery

(Scenery that needs to be researched before it can be built)

Other Notes

.The building rights are already bought here. .This scenario would be much more difficult without the buying rights over water already purchased, or with unlimited funds but no advertising, or with a goal of 1500 guests or more... instead, it was made an easy objective to give another easy scenario.