Showering Shores: Difference between revisions

From RollerCoaster Tycoon Wiki Wiki, the RollerCoaster Tycoon encyclopedia that anyone can edit.
Content added Content deleted
(Created page with "{{Infobox Scenario |pic=Placeholder.JPG |objective=Guests : 1100, by October y.3 |theme=None |start=(Starting Size) |size=(Maximum size from buying all the available land...")
 
No edit summary
Line 12: Line 12:


==Overview==
==Overview==
The amount of rain this park gets is driving guests away. Can you help make this park more popular ?
''The amount of rain this park gets is driving guests away. Can you help make this park more popular ?''


This park is built on a beach, and a large access of water on which building rights are already acquired.
This park is built on a beach, and a large access of water on which building rights are already acquired.
Line 21: Line 21:
==Scenario Guide==
==Scenario Guide==
{{sgreminder}}
{{sgreminder}}


At first, build the missing rides you have at your disposal, so the rides already present are all connected to each other. Guests hate to walk on an empty path between two rides, and you'd hate it too were you in a real park.
At first, build the missing rides you have at your disposal, so the rides already present are all connected to each other. Guests hate to walk on an empty path between two rides, and you'd hate it too were you in a real park.


Line 28: Line 30:


You might also consider demolishing the Roto-Drop by the end of Year 2, so that guests will keep on riding it.
You might also consider demolishing the Roto-Drop by the end of Year 2, so that guests will keep on riding it.

A nice idea would be a monorail that would connect both ends of the park after a trip to the map boundaries across the sea. then  connect both stations through the land, to have more trains available. This would be a good money roller, if you have enough guests to fill in the trains.


The objective is, just, really easy. Keep on building, one ad campaign per year and you're good to go.
The objective is, just, really easy. Keep on building, one ad campaign per year and you're good to go.
Line 67: Line 71:
*[[Path Items]] (example)
*[[Path Items]] (example)
*[[Walls and Fences]] (example)
*[[Walls and Fences]] (example)
*[[Egyptian Theming]]


==Researched Rides==
==Researched Rides==
Line 99: Line 104:
==Researched Scenery==
==Researched Scenery==
(Scenery that needs to be researched before it can be built)
(Scenery that needs to be researched before it can be built)
*??
*[[Egyptian Theming]] (example)


==Other Notes==
==Other Notes==

Revision as of 13:04, 15 March 2014

Overview

The amount of rain this park gets is driving guests away. Can you help make this park more popular ?

This park is built on a beach, and a large access of water on which building rights are already acquired.

Pre-built Rides

(List of pre-built rides and their intensity, excitement, and nausea ratings here)

Scenario Guide

Remember:
  • The Scenario Guide below is only a suggested strategy for completing this scenario—it may not work for all players.
  • The General Scenario Guide and Hints and Tips articles may also provide helpful information in completing this scenario.
  • There are usually multiple strategies to successfully completing a scenario; these can be discussed on the scenario's discussion page or written down in an existing or additional section of this article.


At first, build the missing rides you have at your disposal, so the rides already present are all connected to each other. Guests hate to walk on an empty path between two rides, and you'd hate it too were you in a real park.

Then, search for all thrill & gentle rides you may receive. Place them and open them as soon as you have them.

You may search for one roller coaster, which might be the Stand-Up Twister Coaster. Build a custom design of this one, with only the station on the ground, the remaing parts of the track above water. Max capacity, max excitement rating, max admission charge, as always on a park with free entrance.

You might also consider demolishing the Roto-Drop by the end of Year 2, so that guests will keep on riding it.

A nice idea would be a monorail that would connect both ends of the park after a trip to the map boundaries across the sea. then  connect both stations through the land, to have more trains available. This would be a good money roller, if you have enough guests to fill in the trains.

The objective is, just, really easy. Keep on building, one ad campaign per year and you're good to go.


Available Rides

Transport

Gentle

Roller Coasters

Thrill Rides

Water Rides

Shops and Stalls

Available Scenery

Researched Rides

(Rides that need to be researched before they can be built)

Transport

Gentle

Roller Coasters

Thrill Rides

Water Rides

Shops and Stalls

Researched Scenery

(Scenery that needs to be researched before it can be built)

  • ??

Other Notes

.The building rights are already bought here. .This scenario would be much more difficult without the buying rights over water already purchased, or with unlimited funds but no advertising, or with a goal of 1500 guests or more... instead, it was made an easy objective to give another easy scenario.