Katie's Dreamland/Scenario Guide: Difference between revisions
no edit summary
m (Horsti12 moved page Katie's World/Scenario Guide to Katie's Dreamland/Scenario Guide) |
No edit summary |
||
Line 5:
Katie's World is the second park with a [[Park Value]] goal, though this time it is $15,000 that you are striving for. You start with fewer rides than [[Diamond Heights]], so it is balanced. Start by researching [[:Category:Shops and Stalls|Shops and Stalls]] to get a Drink Stall and maybe another food stall, and hiring some staff.
The Storm can crash at any time in this scenario: one option is to demolish it outright and build something else in its place - a
Though Runaway Plumber is also prone to crashing, it can be saved if you close it and put a brake section before the station. If you have [[Corkscrew Follies]] installed, you may find it useful to put a sign on the exit path for Runaway Plumber and set it to "No
Also, the queue time for the Runaway Plumber is extremely long (16 minutes!), so make sure to shorten the line, as guests will soon become angry.
If you wish to build a fourth roller coaster, the best place to do it would be the blank space next to Runaway Plumber (directly forward from the park entrance, at the end of the park). Continue to build rides throughout the scenario, and if you are still short around July of
[[Category:Scenario Guide]]
|