Grand Canyon: Difference between revisions
Content added Content deleted
(Added all information except maximum park size. I haven't reached that stage yet.) |
m (So much for "all information"...) |
||
Line 154: | Line 154: | ||
===Researched=== |
===Researched=== |
||
None |
None |
||
<br clear="all" /> |
|||
==Park Entrance [[File:Park_Entrance_RCT2_Icon.png]]== |
|||
{{ParkEntrancebox|North America Park Entrance RCT2}} |
|||
<br clear="all" /> |
|||
==Water [[File:Water_RCT2_Icon.png]]== |
|||
{{Waterbox|Natural Water RCT2}} |
|||
<br clear="all" /> |
<br clear="all" /> |
||
Revision as of 17:11, 20 September 2015
Overview
This park features the Grand Canyon, a popular North American National Park attracting more than 5 million visitors every year. The landscape is protected from modification.
Pre-built rides
- Vertical Spike (Air Powered Vertical Coaster)
- Excitement Rating: 8.64 (Very High)
- Intensity Rating: 8.93 (Very High)
- Nausea Rating: 6.93 (High)
- Initial Pricing: $0.00
- Monster Trucks 1 (Monster Trucks)
- Excitement Rating: 4.49 (Medium)
- Intensity Rating: 0.70 (Low)
- Nausea Rating: 0.08 (Low)
- Initial Pricing: $0.00
- Calamity Coaches (Wooden Roller Coaster with Stage Coach vehicles)
- Excitement Rating: 9.11 (Very High)
- Intensity Rating: 9.78 (Very High)
- Nausea Rating: 6.22 (High)
- Initial Pricing: $0.00
Scenario Guide
The scenario guide can be found here.
![](http://static.miraheze.org/rctwiki/thumb/9/96/GrandCanyon-Finished.png/300px-GrandCanyon-Finished.png)
Rides ![](//static.miraheze.org/rctwiki/5/5c/Attractions_2D_Icon.png)
Transport ![](//static.miraheze.org/rctwiki/6/62/Transport_Rides_2D_Icon.png)
Available
Researched
Gentle ![](//static.miraheze.org/rctwiki/9/93/Gentle_Rides_2D_Icon.png)
Available
Researched
Roller Coasters ![](//static.miraheze.org/rctwiki/c/c5/Roller_Coasters_2D_Icon.png)
Available
Researched
Thrill Rides ![](//static.miraheze.org/rctwiki/f/f7/Thrill_Rides_2D_Icon.png)
Available
Researched
Water Rides ![](//static.miraheze.org/rctwiki/2/22/Water_Rides_2D_Icon.png)
Available
Researched
Shops and Stalls ![](//static.miraheze.org/rctwiki/f/f7/Shops_%26_Stalls_2D_Icon.png)
Available
Researched
Scenery ![](//static.miraheze.org/rctwiki/c/ca/Scenery_2D_Icon.png)
Available
Researched
None
Park Entrance ![](//static.miraheze.org/rctwiki/e/e8/Park_Entrance_2D_Icon.png)
Water ![](//static.miraheze.org/rctwiki/d/d0/Water_RCT2_Icon.png)
Other Notes
This is the only RCT2 scenario where staff already present in the park are given non-generic names.
Preceded by | List of scenarios in | Succeeded by |
---|---|---|
Great Wall of China Tourism Enhancement | Wacky Worlds | Rio Carnival |