Anonymous user
Dusty Greens: Difference between revisions
m
→Scenario Guide
(→Notes) |
m (→Scenario Guide) |
||
Line 29:
==Scenario Guide==
{{Sgreminder}}
In this scenario you are limited in space, the two squares of your park have a bridge connecting the two of them and more two squares
First thing to do is short the huge lines for the mini golfs, since it's taking forever, short them to one tile of queue line
Start of with gentle and thrill rides, price the rides for
Since you have unlimited time, you can even finish the scenario
If you need to buy land, make sure to buy the northern part of the 2 available pieces. This is because this part has a building in it, which sells for $90, making the four tiles cost nothing and makes you gain $10. That and the fact that this part is larger, which means you probably don't have to buy construction rights for another bridge. Another good idea is to use the space between the parts you
▲If you need to buy land, make sure to buy the northern part of the 2 available pieces. This is because this part has a building in it, which sells for $90, making the four tiles cost nothing and makes you gain $10. That and the fact that this part is larger, which means you probably don't have to buy construction rights for another bridge. Another good idea is to use the space between the parts you orginally own construction rights to as a space for rides. Using this tactic for bought space with construction rights is no use, as it's cheaper to build rides on normal ground you have to buy, than it is to make the ride needing support.
==Available Rides==
|