Micro Park: Difference between revisions
(Adding categories) |
No edit summary |
||
Line 12: | Line 12: | ||
To have park value at least $10,000, at the end of Year 3. |
To have park value at least $10,000, at the end of Year 3. |
||
==Scenario Guide== |
==Scenario Guide== |
||
{{Sgreminder}} |
|||
Conserve Space, Plan ahead, and build a rollercoaster or 2. With max funding in research you can get a [[Vertical Roller Coaster]] by the end of Year 1, That's good because if you biuld high enough it won't get in the way, but I recomend Thrill Ride until you get a Roto-Drop first (Roto-Drops are the first thing from thrill rides) A note to end on, Fill empty space with scenery. |
Conserve Space, Plan ahead, and build a rollercoaster or 2. With max funding in research you can get a [[Vertical Roller Coaster]] by the end of Year 1, That's good because if you biuld high enough it won't get in the way, but I recomend Thrill Ride until you get a Roto-Drop first (Roto-Drops are the first thing from thrill rides) A note to end on, Fill empty space with scenery. |
||
==Other Notes== |
|||
{{Stub}} |
|||
{{Succession|[[Venus Ponds]]|Loopy Landscapes|None}} |
|||
[[Category:Scenario]] |
[[Category:Scenario]] |
||
[[Category:RollerCoaster Tycoon Scenario]] |
[[Category:RollerCoaster Tycoon Scenario]] |
Revision as of 16:23, 15 July 2010
You must develop the very small park to a profitable park
The tile map is only 15x15.
Overview
As you see, you have a land, in micro scale. Park note: Try to make the world's smallest profitable park.
Objective
To have park value at least $10,000, at the end of Year 3.
Scenario Guide
Remember:
|
Conserve Space, Plan ahead, and build a rollercoaster or 2. With max funding in research you can get a Vertical Roller Coaster by the end of Year 1, That's good because if you biuld high enough it won't get in the way, but I recomend Thrill Ride until you get a Roto-Drop first (Roto-Drops are the first thing from thrill rides) A note to end on, Fill empty space with scenery.
Other Notes
This article or section is under construction. You can help by editing it! Relevant discussion may be available on this article's discussion page. |
Preceded by | List of scenarios in | Succeeded by |
---|---|---|
[[Venus Ponds]] | Loopy Landscapes | None |