Maze: Difference between revisions

Content added Content deleted
Line 15: Line 15:
*Ice
*Ice
==Pre-built designs==
==Pre-built designs==
{{Stubsection}}
===RollerCoaster Tycoon===
===RollerCoaster Tycoon===
====Build menu only====
====Build menu only====
Line 20: Line 21:
*[[:File:SpiralMaze.jpg|Spiral Maze]] (Excitement: ~1.60; Intensity: ~0.60; Nausea: ~0.00; ~$972)
*[[:File:SpiralMaze.jpg|Spiral Maze]] (Excitement: ~1.60; Intensity: ~0.60; Nausea: ~0.00; ~$972)
===RollerCoaster Tycoon 2===
===RollerCoaster Tycoon 2===

==Other Information==
==Other Information==
The Hedge Maze has a unique construction interface that can take a little time to learn. There are three modes: build, move, and fill. Also, changing or deleting part of the maze will cost money (unlike the refund that most rides give). A long or impossible maze will just make guests wait a long time and become unhappy. This ride usually needs only a one-or-two square queue line.
The Hedge Maze has a unique construction interface that can take a little time to learn. There are three modes: build, move, and fill. Also, changing or deleting part of the maze will cost money (unlike the refund that most rides give). A long or impossible maze will just make guests wait a long time and become unhappy. This ride usually needs only a one-or-two square queue line.