Looping Roller Coaster: Difference between revisions

From RollerCoaster Tycoon Wiki Wiki, the RollerCoaster Tycoon encyclopedia that anyone can edit.
Content added Content deleted
mNo edit summary
Line 44: Line 44:
Gives a very smooth ride, and allows the design of long, fast, and twisted track layouts.
Gives a very smooth ride, and allows the design of long, fast, and twisted track layouts.


The difference between the Steel Roller Coaster's powered Launch and the LIM Launched Coaster's launch is that the Steel will pass through the station, while the LIM will not.
The difference between the Steel Roller Coaster's powered launch and the [[LIM Launched Roller Coaster]]'s launch is that the train will pass through the station for the Steel Roller Coaster, which is not true of the LIM Launched Coaster's train.


===Approximate Cost===
===Approximate Cost===

Revision as of 06:43, 8 December 2009

Diamond Heights starts out with twin steel roller coasters.
Steel Roller Coaster
Type Roller Coaster
Description A smooth and fast roller coaster, can be used for conventional designs or "shuttle" designs.
Cost $3,350 upwards
Size Large (actual size depends on construction)
Appearances RCT, RCT2, RCT3

Construction

Track has a tubular steel spine, connected to the inside edges of tubular steel running rails. Supports are large tubular steel posts. Trains are held on the track by wheels above, below, and outside the running rails.

Special Track Elements

  • Banked Curves
  • Vertical Loop
  • Steep Twist
  • Banked Helix
  • On-Ride-Photo

Constraints

  • Banked curves - 50° banking
  • Maximum track slope - 60°
  • Lift hill maximum slope - 25°
  • Maximum height above ground - 150 ft

Vehicles

  • Roller Coaster Train
  • Roller Coaster Train (facing backwards)

Other Information

Gives a very smooth ride, and allows the design of long, fast, and twisted track layouts.

The difference between the Steel Roller Coaster's powered launch and the LIM Launched Roller Coaster's launch is that the train will pass through the station for the Steel Roller Coaster, which is not true of the LIM Launched Coaster's train.

Approximate Cost

$3,350 upwards

Appears In