First Encounters/Scenario Guide: Difference between revisions
Content added Content deleted
No edit summary |
Bodoc Calado (talk | contribs) mNo edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Sgreminder}}[[File:EEComplete.png|thumb|Scenario completed]] |
{{Sgreminder}}[[File:EEComplete.png|thumb|Scenario completed]] |
||
The loan interest is high (19%), so be sure to always pay back whenever |
The loan interest is high (19%), so be sure to always pay back whenever the balance is high enough. |
||
Since this is pay |
Since this is a pay-per-entry park, it's recommended to increase the guest in and out flow. This can be achieved by closing the [[ATM|ATM machine]]. |
||
Start with building all non-tracked |
Start with building all non-tracked rides available, and raise the park entry fee steadily. To earn a high park value, you should build roller coaster with high throughput. Keep the track short, and build a ride photo section for extra income. Building three roller coasters should be enough to win this scenario. Good candidates for such coasters are [[Spiral Roller Coaster]], [[Vertical Roller Coaster]], and [[Wooden Roller Coaster]]. |
||
[[Category:Scenario Guide]] |
[[Category:Scenario Guide]] |
Latest revision as of 12:20, 22 September 2023
Remember:
|
The loan interest is high (19%), so be sure to always pay back whenever the balance is high enough.
Since this is a pay-per-entry park, it's recommended to increase the guest in and out flow. This can be achieved by closing the ATM machine.
Start with building all non-tracked rides available, and raise the park entry fee steadily. To earn a high park value, you should build roller coaster with high throughput. Keep the track short, and build a ride photo section for extra income. Building three roller coasters should be enough to win this scenario. Good candidates for such coasters are Spiral Roller Coaster, Vertical Roller Coaster, and Wooden Roller Coaster.