Tiny Towers: Difference between revisions
Content added Content deleted
No edit summary |
|||
Line 8: | Line 8: | ||
==Scenario Guide== |
==Scenario Guide== |
||
{{Sgreminder}} |
{{Sgreminder}} |
||
First biuld a boat hire on the lake, a swinging ship, and an infomation kiosk. (slight landscaping is required for biuld the entrence of the boat hire) You income and loan (maxed out at $22,000) should be enough to complete this scenario |
First biuld a boat hire on the lake, a swinging ship, and an infomation kiosk. (slight landscaping is required for biuld the entrence of the boat hire) You income and loan (maxed out at $22,000) should be enough to complete this scenario, but be very carful as the park can become very crowded as your building the rollercoasters and rides. |
||
==Available Rides== |
==Available Rides== |