Hydro Hills: Difference between revisions

Content deleted Content added
Line 10: Line 10:


==Scenario Guide==
==Scenario Guide==
{{sgreminder}}
This one is pretty easy. Built some gentle rides at the start and ask 10$ entry and 50cents per ride, Then built some tracked rides and one roller coaster, money should get in easy now.� DO NOT higher your loan, you need get an park value and that will lower if you loan to much.
This one is pretty easy. Built some gentle rides at the start and ask 10$ entry and 50cents per ride, Then built some tracked rides and one roller coaster, money should get in easy now.� DO NOT higher your loan, you need get an park value and that will lower if you loan to much.

==Available Rides==
==Available Rides==
===Transport Rides===
===Transport Rides===