Dusty Desert: Difference between revisions
Content added Content deleted
mNo edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
''Five coasters require completion in this desert park.'' |
''Five coasters require completion in this desert park.'' |
||
This park takes place in a desert oasis. The goal in this scenario is to finish building five incomplete |
This park takes place in a desert oasis. The goal in this scenario is to finish building five incomplete roller coasters. |
||
===Pre-Built Rides=== |
===Pre-Built Rides=== |
||
Line 166: | Line 166: | ||
==Other Notes== |
==Other Notes== |
||
Roller Coaster 5 is extremely easy. '''Do not lengthen the lift hill!''' Then make a vertical drop, then make a vertical hill until it gets above ground and drop it again. Now a banked U-turn (mid-sized turns) and up 6 "humps" (up then down) and another banked U-turn and add 2 more Humps. |
Roller Coaster 5 is extremely easy. '''Do not lengthen the lift hill!''' Then, make a vertical drop, then make a vertical hill until it gets above ground and drop it again. Now a banked U-turn (mid-sized turns) and up 6 "humps" (up then down) and another banked U-turn and add 2 more Humps. |
||
{{Succession|Crazy Craters|Loopy Landscapes|Woodworm Park}} |
{{Succession|Crazy Craters|Loopy Landscapes|Woodworm Park}} |