Dinghy Slide: Difference between revisions

Content added Content deleted
No edit summary
(added bold to "water slide in RCT1")
Line 28: Line 28:
*Ice Flow
*Ice Flow
===Other Information===
===Other Information===
*This ride is called Water Slide in [[RCT1]].
*This ride is called '''Water Slide''' in [[RCT1]].
*[[File:Dinghyreadme.png|thumb|400px|A message in the RCT2 manual saying that the dinghy slide does not include water.]]A good dinghy slide requires at least one steep drop, but can be extended into a complex layout, so long as care is taken on the crests of hills, as dinghies can crash off the track.
*[[File:Dinghyreadme.png|thumb|400px|A message in the RCT2 manual saying that the dinghy slide does not include water.]]A good dinghy slide requires at least one steep drop, but can be extended into a complex layout, so long as care is taken on the crests of hills, as dinghies can crash off the track.
*A remedy for the problem is to build a completely circular section of track at the crests of hills and in the turns, which prevent the dinghies from leaving the track. Also by covering the track instead of the roofless track, it can prevent dinghies crashing, although it will lower the excitement. In RCT1, covered track sections also cost $1 more than uncovered ones.
*A remedy for the problem is to build a completely circular section of track at the crests of hills and in the turns, which prevent the dinghies from leaving the track. Also by covering the track instead of the roofless track, it can prevent dinghies crashing, although it will lower the excitement. In RCT1, covered track sections also cost $1 more than uncovered ones.