The Money Pit: Difference between revisions

no edit summary
No edit summary
Line 43:
'''Western Hats 01''' (Western Hats)
 
 
==Scenario Guide==
 
==Objectives==
 
 
Apprentice: VIP (Joe Sluggerball). Arrives 21 June. Litter tolerance: High 
 
Total monthly ride income: $200.00 Sustained for at least 1 month.
 
Entrepreneur: VIP (Joe Sluggerball). Arrives 18 July. Litter tolerance: Medium 
 
Total monthly ride income: $600.00 Sustained for at least 2 months.
 
Tycoon:VIP (Joe Sluggerball). Arrives 6 Sept. Litter tolerance: Low
 
Total monthly ride income: $1000.00 Condition can be achieved at any time.
 
 
 
<span style="font-size:18px;">Scenario Guide</span>
{{Sgreminder}}Despite the condition of the park, DO NOT delete all the rides. This is because all that down time has given theme suprisingly high reliability. Terror Spinner and Wagon Wheel are the exceptions to this. As for the Avenger, you have two options: Complete the ride or demolish it. Either one works, but if you choose to complete the ride, replace the brakes towards the end with block brakes so you can run two trains at once. Then hire four mechanics and assign two to the adventure side of the park and two to the western side and the rides should get up and running fairly quickly. Then hire 4-6 janitors. Trust me this isn't enough janitors to clean the entire park, but you don't need to do that anyway. Instead, just spend time deleting paths, one square at a time and replacing them with a new square. You can even change the type of path if you want. This will have you set for the VIP all the way through tycoon level. After that just spend time building rides and you should be good. Also, build the second coaster on the western side of the park because if one side has more coasters than the other the side with fewer coasters tends to lose a lot of popularity.
==Available Rides==
Anonymous user