Lightning Peaks

Revision as of 14:11, 7 February 2016 by Larry98 (talk | contribs)

Overview

The beautiful mountains of Lightning Peaks are popular with walkers and sightseers. Use the available land to attract a new thrill-seeking clientele.

This park has every original RCT attraction and scenery available for research.

This park basically consists of four separate mountains connected via pathways, as well as two chairlifts: One from the entrance to the top, and the other connecting two peaks. Although the park is big, there is almost no flat land. This makes it very difficult for the player to build rides effectively and to connect entrances and exits to the existing pathways. There are a lot of trees in the park too, hindering the players progress. The name Lightning Peaks is also very descriptive of the Park's weather: it almost always rains with constant thunderstorms that can easilly deter guests from Roller Coasters and other open air track rides. However, it does provide an opportunity to sell hundreds of umbrellas from an Information Kiosk.

You start this scenario with a loan of $5,000 out of a possible maximum of $15,000.

Pre-Built Rides:

  • Chairlift 1 / Skyride 1 (Chairlift)
Excitement Rating: 2.90 (Medium)
Intensity Rating: 0.55 (Low)
Nausea Rating: 0.53 (Low)
Initial Pricing: $1.50
Age: New
  • Chairlift 2 / Skyride 2 (Chairlift)
Excitement Rating: 1.38 (Low)
Intensity Rating: 0.28 (Low)
Nausea Rating: 0.27 (Low)
Initial Pricing: $1.50
Age: New

Scenario Guide

You can read the Scenario Guide here

Attractions

Transport Rides  

Available

 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Gentle Rides  

Available

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Roller Coasters  

Available

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Upgrades

Thrill Rides  

Available

 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Water Rides  

Available

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Shop & Stalls  

Available

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Researched

 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)
 
Vehicle
(Ride)


Available Scenery

Researched Scenery

Other Notes

  • This is a scenario that has not a temperature of 17 at the beginning, but it is 13, this indicates that there is more rain in this scenario
Preceded by List of scenarios in Succeeded by
Big Pier RollerCoaster Tycoon Ivory Towers