First Encounters/Scenario Guide: Difference between revisions
First Encounters/Scenario Guide (view source)
Revision as of 12:20, 22 September 2023
, 8 months agono edit summary
Figmeister (talk | contribs) (Adding categories) |
Bodoc Calado (talk | contribs) mNo edit summary |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 1:
{{Sgreminder}}[[File:EEComplete.png|thumb|Scenario completed]]
The loan interest is high (19%), so be sure to always pay back whenever the balance is high enough.
Since this is a pay-per-entry park, it's recommended to increase the guest in and out flow. This can be achieved by closing the [[ATM|ATM machine]].
Start with building all non-tracked rides available, and raise the park entry fee steadily. To earn a high park value, you should build roller coaster with high throughput. Keep the track short, and build a ride photo section for extra income. Building three roller coasters should be enough to win this scenario. Good candidates for such coasters are [[Spiral Roller Coaster]], [[Vertical Roller Coaster]], and [[Wooden Roller Coaster]].
[[Category:Scenario Guide]]
|