Diamond Heights: Difference between revisions

m
gallery edit, minor typos
m (rewrote the guide)
m (gallery edit, minor typos)
Line 14:
''Diamond Heights is already a successful theme park with great rides - develop it to double its value.''
 
'''Diamond Heights''' is the first of only a few scenarios with a goal of [[Park Value]] goal in the original ''[[RollerCoaster Tycoon]]''. There are already several pre-built rides which work well, but they are slightly old, with Agoraphobia and Claustrophobia being prone to crashing. Still, this scenario should pose few problems.
 
===Pre-built rides===
Line 75:
While the four roller coasters in Diamond Heights are probably more than enough to satisfy the needs of the guests, you may need to build a fifth roller coaster in order to reach the objective, although this should only be done as a last resort. Shortstuff's Slide may need to be changed to single ride per admission mode, as some guests may ride again and again while complaining about being on the ride too long, and make people in queue wait longer. Even though this will lower the excitement rating, it's an easy choice to do. You can also increase the ride's capacity by allowing 5 riders on it instead of 4.
 
Make sure you lower the inspection time of both of the dueling roller coasters named Claustrophobia and Agoraphobia to 10 minutes. This is due to the fact that both these rollercoastersroller coasters can [[Crash|crash]] due to a station brakes failure, which mostly occurs in either the second or third years. Place two mechanics patrolling at the exits of both rides is a very good prevention method for these crashes. An alternative is to reducing both coasters' train count to one and their car count to eight, which will increase the excitement rating yet lower the rides' capacities and therefore benefits. This choice is harder to do than Shortstuff's Slide, but you can do it. Inserting brakes set below 45 km/h (28 mph) or reediting the tracks in order to incorporate a brakes line, might also prove useful.
 
Once all this is done, the scenario's quite easy to complete : build new rides & rebuild the non-tracked ones from scratch to rebuff the park's value, (try rebuilingrebuilding the splash or the ''Agoraphobia'' if you want a good challenge) , build a brand new coaster if you haven't met the requirements at June 31st of theyear final year3, and you should make it.
 
[[File:DiamondHeightsFinished.png|thumb|324px|Diamond Heights - finished]][[File:DH.png|thumb|324px|Diamond Heights (finished succesfully)]]
 
==Available rides==
Line 177 ⟶ 175:
 
==Completed Parks==
[[File:SCR4.png|left|thumb|324x324px|Diamond Heights - finished by RMattos[[File:DH.png|thumb|324px|Diamond Heights - finished by Felipe717{{Succession|Leafy Lake|RollerCoaster Tycoon|Evergreen Gardens}}|centre]]]]
<gallery>
[[File:DiamondHeightsFinished.png|thumb|324px325x325px|Diamond Heights - finished by Hadesengel]][[FileCategory:DH.png|thumb|324px|Diamond Heights (finished succesfully)Scenario]]
SCR4.png
</gallery>
{{Succession|Leafy Lake|RollerCoaster Tycoon|Evergreen Gardens}}
[[Category:Scenario]]
[[Category:RollerCoaster Tycoon Scenario]]