The Money Pit/Scenario Guide: Difference between revisions

m
Changed tip about changing rides
(Created page with "{{Sgreminder}}Despite the condition of the park, DO NOT delete all the rides. This is because all that down time has given them surprisingly high reliability. Terror Spinner a...")
 
m (Changed tip about changing rides)
 
(One intermediate revision by one other user not shown)
Line 1:
{{Sgreminder}}Despite the conditionAll of the park,base DOrides NOThave deleteextremely allinflated theNausea rides.stats Thisthan is becausenormal, allso thatreplace downall timethe hasrides given(except themthe surprisinglyWild highWest reliability.show, Terrorsince Spinnerit andhas Wagona Wheelrating are the exceptions toof this0). As for the Avenger, you have two options: Complete the ride or demolish it. Either one works, but if you choose to complete the ride, replace the brakes towards the end with block brakes so you can run two trains at once. Then hire four mechanics and assign two to the adventure side of the park and two to the western side and the rides should get up and running fairly quickly. Then hire 4-6 janitors. Trust me this isn't enough janitors to clean the entire park, but you don't need to do that anyway. Instead, just spend time deleting paths, one square at a time and replacing them with a new square. You can even change the type of path if you want. This will have you set for the VIP all the way through tycoon level. After that just spend time building rides and you should be good. Also, build the second coaster on the western side of the park because if one side has more coasters than the other the side with fewer coasters tends to lose a lot of popularity.
 
[[Category:Scenario Guide]]
12

edits