Renovation: Difference between revisions

1,136 bytes added ,  11 years ago
Added a much easier way of completing the scenario.
(Added a much easier way of completing the scenario.)
Line 23:
First of all open the park and allow guests in to the area surrounding the entrance only. Then you should open the monorail and rebuild the missing links in the rollercoasters, after this you should remove the scenery blocking paths and hire handy men to clear up the litter and then rebuild the paths. Once this has been done open this part to the guests you can then open the shops and stalls whilst also opening the other rides, keep adding more rides and letting the income from you entrance fee. Keep your profits up and you should complete the scenario in 2 to 3 years.
If you want, you can also replace the brown scenery found in the abandoned park with the colourful scenery found in the better part of the park so it matches but then again you don't have to as it can drain you cash and is also very time consuming.
 
 
 
An alternative method, however, turns this from difficult to ridiculously easy. First, demolish all the rides, bathrooms, kiosks, and stalls. Pay back your loan with this money - as quick as possible, so you remove that drain on your money.
 
Then, demolish every bit of scenery that gives you money, and remove every piece of path. It should take 2-5 months in-game time, and leave you with around $45,000 or more. Now, make a simple loop of path around your park, possibly with an extra path right down the middle to increase your build-room.
 
Use the existing holes in the ground to run an underground rollercoaster, transport ride, or gentle ride with four stations. Set your admission to $20, and open the park. Start surrounding the four stations for your underground ride with a mix of thrill rides and gentle rides, and open them as soon as they are constructed to start drawing in guests. Build a few cheap rollercoasters - the Shuttle Loop version with a looping rollercoaster is cheap and easy - in these areas as well.
 
The scenario will usually be completed by the time you've built rides in three of the four corners.
 
 
==Available Rides==
===Transport===
Anonymous user