Pacific Pyramids: Difference between revisions

m
no edit summary
mNo edit summary
Line 15:
 
 
This park is located in a desert, filled with egyptian scenery. There is already a path system created, although benches and trashcans are missing. The path leading from the top of the left dune to the sphinx building via underground passage should be cut off or deleted completely. The park is medium sized, but can be expanded greatly at 15$ per land square if necessary.
{{Stubsection}}
 
 
[[File:PacificPyramidsStart.png|thumb|Easy Start (Entry Fee: $30)]]
=== Pre-Built Rides: ===
None
Line 22 ⟶ 24:
== Scenario Guide ==
{{sgreminder}}
Because the large size and the vast variety of scenery, it's possible to complete this very easily. First, build a roller coaster. You should have built at least five by the objective time. But that could be difficult.
 
This scenario is really easy. You have enough space, and 1,000 guests in 4 years should be no problem, especially if you successfully completed the [[Mothball Mountain|previous scenraio]]. For an easy start, build your gentle and thrill rides, as well as two synchronized Steel Roller Coasters in shuttle mode and one of each stall. You might want to cut off the unused paths for now. Once that is taken care of, set your entry fee to $30, gentle rides to $0.50, thrill rides to $1.00 and both coasters to $2.00 and start advertising for your park for as long as your money allows. You shouldn't need to take another loan besides the starting $10k. Continue advertising until you have completely repaid your loan and remeber to hire some handymen and mechanics (Refer to the screenshot above for a small overview).
If you are strapped for cash, try to delete the scenery, like the pyramids or the Sphinxes to get a little money. Remember to also build gentle rides, thrill rides, water rides and stalls, as well.
 
It should be smooth sailing from now on, just expand at a slow-medium pace, and if you are short of a few guests in year 4, just start another campaign.
 
== Available Rides ==
1

edit