Pacific Pyramids/Scenario Guide: Difference between revisions
Content deleted Content added
mNo edit summary |
Gymnasiast (talk | contribs) Update link to Mystic Mountain, fix typos |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 1:
{{sgreminder}}
== Strategy ==
This scenario is not really difficult actually.
Reaching the guest objective isn't hard at all : players still short of guests as deadline approaches should reduce their prices for rides (not for shops/stalls) and launch a couple ad campaigns to push the numbers up. Turning the flat rides near the entrance free, would also help in holding broke guests in an extra couple of months.
▲Have in mind that if you research at maximum funding for 4 years you'll have researched all the roller coasters and gentle/thrill rides availabe, so if you do this you'll also get some shops and stalls. Shops and stalls variety is an important factor in a 4-year scenario because the lack of variety may become a negative effect over the time.
== Completed Parks ==
<gallery widths="310" spacing="small">
Pacific Pyramids RCT 2.jpg|Pacific Pyramids — finished by Zachl1226.▼
PacificPyramidsFinished.png|Pacific Pyramids — finished by Hadesengel.
Pacific Pyramids.png|Pacific Pyramids — finished by Felipe717.
▲Pacific Pyramids RCT 2.jpg|Pacific Pyramids — finished by Zachl1226 (version #1).
</gallery>
▲[[File:Pacific Pyramids RCT.jpg|thumb|347x347px|Pacific Pyramids — finished by Zachl1226 (version #1).]]
▲[[File:Pacific Pyramids RCT 2.jpg|thumb|346x346px|Pacific Pyramids — finished by Zachl1226 (version #2).]]
[[Category:Scenario Guide]]
|