Megaworld Park: Difference between revisions

Line 301:
While you are busy repairing, the park rating will recover steadily and finally, guests will start streaming in your park. You will not need many more rides, but still squeeze in what you research.
 
Good options would include replacing the Viper Coaster by a smoother design, like a [[Steel Twister Roller Coaster]]. Another idea is to delete the [[Steel Mini Coaster]] in the mountains on the far-right corner, and use the station of this ride to place an [[Air-Powered Vertical Coaster]].
 
==If you play on RCT2==
 
Several good options to this scenario if you play it on RCT2 :
*Replace the Viper Coaster by a smoother design, like a [[Hyper Coaster]],  a [[Giga Coaster]] or a [[Steel Twister Roller Coaster]].
*Replace the Chairlift on the bottom-left corner of the map with a monorail to increase it's capacity.
*Bank the curves of the Wooden and Steel Looping Roller Coasters, to decrease their intensity ratings.
*Consider demolishing one of the two wooden coasters, to replace it by a ride you might research. I'd suggest you to demolish the Cyclone, which is prone to crashing.
*If you try to create a Wooden Mine Ride in the Mine Sector (duh!), Remember to keep it short, as this ride has a very small capacity.
 
==Available rides==