Megaworld Park/Scenario Guide: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 8:
Consider demolishing and replacing both Viper and Purple Peril, but follow the tips below should you wish to keep them.
 
The [[Steelroller Corkscrew Roller Coaster]]coaster in the desert area, Viper, has too high of an intensity rating. ThisYou hascan tofix bethe fixedproblem by flattening hills and removing some inversions; the tracktwo acobra bit,rolls bankingtoward whateverthe final helix section are obvious candidates because they can be banked,replaced andwith removinga ansmall inversionbanked orleft twocurve. Be sure to add a brake line near the end to reduce the chance of Station Brakes​ Failure [[crash]]es; you may also reduce the ride to running a single 8 car train, but thisdoing so will reduce capacity and increase intensity. The ride's excitement rating can rise to about 8 with only minor edits, so do not feel like you need to spend a long time tweaking it.
 
EditAs thewith [[InvertedViper, Roller Coaster]],edit Purple Peril, by removing some inversions. This will decrease its nausea rating significantly, although its​the rating will remain relatively high; be sure to put a handyman on patrol and some benches on the exit path. Reduce the train length to 5 cars to prevent brakes failure crashes and adjust the timing so that the trains will only leave with a full load; you may keep the train length at 6 or 7 cars instead if you add enough helices at the end to bring trains to a safe speed before arrival at the station. Lengthen the ride's queue path before you reopen it.
 
The [[Steel Mini Roller Coaster]], Spinner, has a high nausea rating and poses a risk of brakes failure crashes. You will need to remove the ride or edit it considerably. It​​You can bemake made farit less nauseating by replacing the spinning cars bywith non-spinning ones, although theyou would render its name wouldmeaningless beand renderedreduce meaninglessits excitement rating. You should also raise the station to the height of the track before the final drop to ensure the trains enter the station at a safe speed.
 
Cyclone, Big Bug, Thunderlooper, and Runaway Mine Train posecarry a dangerrisks of brakes failure crashes but are otherwise well built. You can make Cyclone safe by editing it to include a water splash section just before the station, but you will otherwise want to reduce each ride to a single train unless you rework each so that the trains arrive at the station below 30 MPH (48 km/h).
 
While you are busy repairing, the park rating will recover steadily and guests will eventually start streaming in your park. You will not need many more rides, but you should still squeeze in what you research.
Anonymous user