Ivory Towers: Difference between revisions

no edit summary
m (Added information regarding ride names and versions in which they appear.)
No edit summary
Line 23:
* Guests that will get unhappy soon as there are no toilets
 
The park itself is built quite well, there is a lot of space to expand, especially on the water. This is one of the hardest scenarios if you don't know what you are doing but Once the problems are removed, this scenario will be very easy. Interestingly, all scenery objects are available from the start, so if you want to create a themed park, you can do so right off the bat.
 
This scenario starts with a loan of $10,000 out of a possible $20,000.
Line 56:
You might want to consider removing Hurricane, as it is way too intense. With the money you get for it, you can build a new roller coaster in the same place easily. However, if you change the trains on Hurricane to two cars, it will be less intense due to reduced velocity, and should be a popular and profitable coaster. But in a safety cut out you may run across stalled trains at the end of the track.
 
Once all that is done, you can start building some rides.
[[File:IvoryTowersFinished.png|thumb|Ivory Towers - finished]]
Begin by building some gentle and thrill rides around the park. If your hired staff are taking too much out of your pocket, go ahead and sack a few of them, but leave enough around to keep things in check. Be sure to hire a few mechanics as well. After you recover mostly from the problems, try building a Shuttle Loop, or Steel Mini Coaster. This will bring in about 200 more guests and increase your park rating. Also make sure to place a camera on the Shuttle Loop for extra cash!