Ivory Towers: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 52:
== Scenario Guide ==
{{sgreminder}}
Ivory Towers is an extremely huge park with lots of space to build rides and attractions. Before you can do that, however, make "Tree Topper" have only one train as it willcan break down with station brakes failure soon, then handle the huge amounts of litter, vomit and vandalism that cover virtually every path tile like measles. Start off by hiring five toa tendozen handymen, placing them in different areas of the park, before building food and drink stalls and replacing or removing any vandalism manually. Next, hire a few security guards and get them to patrol the park. Once all that is done, you can start building some rides.
[[File:IvoryTowersFinished.png|thumb|Ivory Towers - finished]]
Begin by building some gentle and thrill rides around the park. If your hired staff are taking too much out of your pocket, go ahead and sack a few of them, but leave at least five handymen and security guards around to keep things in check. Be sure to hire a few mechanics as well. After you recover mostly from the problems, try building a Shuttle Loop, or Steel Mini Coaster. This will bring in about 200 more guests and increase your park rating. Also make sure to place a camera on the Shuttle Loop for extra cash!
 
You might want to consider removing Hurricane, as it is way too intense. With the money you get for it, you can build a new roller coaster in the same place easily. However, if you change the trains on Hurricane to two cars, it will be less intense due to reduced velocity, and should be a popular and profitable coaster. But in a safety cut out you may run across stalled trains at the end of the track.
 
Once all that is done, you can start building some rides.
[[File:IvoryTowersFinished.png|thumb|Ivory Towers - finished]]
Begin by building some gentle and thrill rides around the park. If your hired staff are taking too much out of your pocket, go ahead and sack a few of them, but leave at least five handymen and security guardsenough around to keep things in check. Be sure to hire a few mechanics as well. After you recover mostly from the problems, try building a Shuttle Loop, or Steel Mini Coaster. This will bring in about 200 more guests and increase your park rating. Also make sure to place a camera on the Shuttle Loop for extra cash!
 
== Available Rides ==
Anonymous user