Grand Canyon/Scenario Guide: Difference between revisions
m
no edit summary
m (Just thought I'd clarify that bit...) |
mNo edit summary |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 1:
{{Sgreminder}}
[[File:GrandCanyon-Finished.png|thumb|right|Grand Canyon — Finished]]
You start this scenario off with $10,000, of which $5,000 is loaned from the bank.
The first thing to note about this scenario is that it is a park entrance fee scenario, which means the rides are free. You should therefore ensure a steady flow of guests walking through the park entrance in order to generate the income needed to continue building rides throughout the course of the scenario. To this effect, you may want to consider demolishing all the food and drink stalls, as well as the two
The next thing to note is that the loan interest rate in this scenario is 15%, which is somewhat on the steep side. Pay off your $5,000 loan ''immediately''. For the remainder of the scenario, you should try not to borrow any money from the bank.
Line 12 ⟶ 13:
Browse through the list of rides available for construction. This scenario makes things a little easier for you as you already have a nice variety of coasters to build. In addition, the first ride to be researched is the River Rapids, one of the higher-capacity water rides available.
Calamity Coaches should have finished its test run by this point. You may wish to modify its queue lines before opening it due to its low seating capacity.
You should stick to building flat rides and compact coaster designs in order to make the most of whatever space there is available. Despite the size of your park, space might be a potential issue since the designs of Calamity Coaches and Monster Trucks 1 make it challenging to expand into the huge amounts of isolated empty space where they are built. For a start, you ought to focus on cramming as many rides as you can into whatever free space there is already available around Vertical Spike and Monster Trucks 1. While not necessary, demolishing the "American flag" garden patch will give you enough space to build some flat rides and/or a small coaster.
Calamity Coaches, Vertical Spike, and Monster Trucks 1 alone will ensure that, for a few months after you open the park, guests will enter your park at a steady rate, giving you a
If research is left at Normal Funding from the start of the game, every item that can be researched will be made available by the end of September, Year 3. You can thereafter set research funding to No Funding as you will no longer get any new rides or stalls from research.
[[Category:Scenario Guide]]
[[Category:North America]]
|