Goldrush!: Difference between revisions

no edit summary
m (→‎Facilities: bot, replaced: [[A.T.M. → [[Cash Machine)
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 2:
{{Infobox_Scenario
|pic = Gold_Rush.png
|theme = Western
|description = Now's your chance to hit paydirt by using this unstable, abandoned mining area to showcase low-rise coasters. Over time your coasters must start to make up in adrenaline what they lack in height to keep your claim staked with the visitors.
|objective = '''Apprentice:''' Minimum coaster excitement: 3, with 2 coasters; Minimum coaster length: 305.00 m, 2 coasters; Total monthly ride income: $300.00
*<br> Minimum Coastercoaster Lengthlength: 305.00 m (1000.66 ft), 2 coasters;
Entrepreneur: Repay loan;<br> Total monthly ride income: $500300.00
<br>'''Entrepreneur:''' Repay loan;
<br> Total monthly ride income: $500.00
<br>'''Tycoon:''' Minimum coaster excitement: 4.00, 3 coasters;
*<br>Minimum Coastercoaster Lengthlength: 370.00 m (1213.91 ft), 3 coasters;
<br>Total monthly ride income: $700.00
|rating =
|park value =
|guests =
|guest cash range =
|admission =
|start =
|size =
|price = 25}}.00
|rights =
|rides/attractions =
|staff = 0
|cash = $12,000.00
|loan/limit = 1,000.00 ($5,000.00)
|loan interest rate =
|game = RollerCoaster Tycoon 3
|preceded = Vanilla Hills
|followed = Checkered Flag
}}
|objective = Apprentice: Minimum coaster excitement: 3, with 2 coasters; Minimum coaster length: 305.00 m, 2 coasters; Total monthly ride income: $300.00
[[File:RCT3 campaing 02 - Goldrush! Icon.jpgpng|thumb|225x225px|The emblem
 
Entrepreneur: Repay loan; Total monthly ride income: $500.00
 
Tycoon: Minimum coaster excitement: 4, 3 coasters; Minimum coaster length: 370.00 m, 3 coasters; Total monthly ride income: $700.00
|theme = Western
|start =
|size =
|price = 25}}
[[File:RCT3 campaing 02 - Goldrush!.jpg|thumb|225x225px|The emblem
of the scenario – featuring two guests with a park map, with the silhouette of Mine Shaft Screamer, a Wagon Wheel and
the scenery in the background.]]
Line 45 ⟶ 61:
 
=== Apprentice ===
*Minimum Coaster Excitement: 3.00, with 2 Coasters
 
*Minimum Coaster ExcitementLength: 4305.00 m (1000.66 ft), 32 coasters
 
*Minimum Coaster Excitement: 3, with 2 Coasters
 
*Minimum Coaster Length: 305.00 m, 2 coasters
 
*Total monthly ride income: $300.00
*Reward: New park unlock
 
=== Entrepreneur ===
 
 
*Repay Loan
 
*Total monthly ride income: $500.00
*Reward:
 
=== Tycoon: ===
*Minimum Coaster Excitement: 4.00, 3 coasters
 
*Minimum Coaster Length: 370.00 m (1213.91 ft), 3 coasters
 
*Minimum Coaster Excitement: 4, 3 coasters
*Minimum Coaster Length: 370.00 m, 3 coasters
 
*Total monthly ride income: $700.00
*Reward:
 
== Scenario Guide ==
The scenario guide can be viewed [[Goldrush!/Scenario Guide|here]].
{{Sgreminder}}First off, open all of the rides and hire a few mechanics to keep them operational. If you need to delete any of the pre-built rides, demolish the Mine Shaft Screamer. Keep Mining Mission, as it satisfies all the coaster requirements up through Tycoon level. Also keep Dynamite Danger, as it is popular and helps your ride income. For the first roller coaster you need to build, build it in the large space to the right of the entrance. Then, build another one at the top of the hill at the back, and use its height to send it anywhere you like inside the park. Lastly, increase the prices on all the rides, build a few non-tracked rides if necessary, and then pay off your loan. With luck, you should beat the Entrepreneur and Tycoon levels at the same time.
 
An easy way to get a steady income is to build four or five thrill/gentle/kiddie rides right near the entrance in a compact area, equipped with its own fully trained janitor (set the path) and mechanic (set his path) and food/drink/bathroom stalls. Don't forget to adjust your research to fit the objectives. In this case, you can pretty much just eliminate all other categories and only have your blue bar for roller coaster research. The four or five rides technique can be done in every level with positive results. It is self-sustaining and a very easy way to raise ride income. With that ride income, you can build the required coasters (you can use pre-built ones easy enough).
 
{{Cleanup}}
 
==Available Rides==
Line 90 ⟶ 95:
=== Junior ===
* [[Buffalo Roundabout]]
* [[Spiral slideSlide]]
 
=== Thrill ===
* [[Bucking Bull]]
* [[Mine Drop Ride]]
* [[Rotovator]]
* [[TNT Vortex]]
Line 102 ⟶ 107:
=== Gentle ===
* [[Ferris Wheel|Western Wheel]]
* [[Wild West show]]
 
=== Transport ===
Line 120 ⟶ 125:
===​Gentle===
===​Transport===
*[[Suspended Monorail Trains]]
===Other===