Forest Frontiers: Difference between revisions

Fix ride list
No edit summary
(Fix ride list)
Line 32:
=={{Attractions}}==
==={{Transport Rides}}===
 
====Available====
===Randomly selected===
[[Miniature Railroad]] or [[Monorail]]
One of these will be available while the other will need to be researched
{{Ridebox2D|Steam Trains|RCT1}}
{{Ridebox2D|Small Monorail Cars|RCT1}}
<br clear="all" />
 
====Researched====
[[Miniature Railroad]] or [[Monorail]]
{{Ridebox2D|Chairlift Cars|RCT1}}
{{Ridebox2D|Streamlined Monorail Trains|RCT2}}
<br clear="all" />
 
Line 44 ⟶ 48:
{{Ridebox2D|Haunted House|RCT1}}
{{Ridebox2D|Merry-Go-Round|RCT1}}
{{Ridebox2D|SportcarsSportscars|RCT1}}
{{Ridebox2D|Racing Cars|RCT2}}
{{Ridebox2D|Pickup Trucks|RCT2}}
Line 151 ⟶ 155:
</gallery>
 
==RCT Classic edition==
Forest Frontiers as included in [[RollerCoaster Tycoon Classic]] is largely unaltered from the edition described above. Ride upgrades are not researched in RCT Classic. Instead all of the upgrades are incorporated into the ride when it is first made available. For example, the [[Wooden Roller Coaster]] begins with both Vertical Loop and Water Splash available to use. The [[Junior Roller Coaster]] begins with both Ladybird Trains and Log Trains while the Spinning Trains are never made available. The other differences in the Classic edition are limited to the lists of scenery and researched attractions. The scenario begins with five items of [[Mine Themeing|Mine Theming]] available: Broken Wheel, Barrel, Junk, Mine Hut, and Mine Shaft. Research occurs in the following order: [[Ferris Wheel]], [[Log Flume]], [[Information Kiosk]], [[Looping Roller Coaster]], [[Observation Tower]], [[Dodgems]], [[Suspended Swinging Coaster]], [[Steeplechase]], [[Fries Shop]], [[Wooden Wild Mouse]], [[Maze]], [[Balloon Stall]], [[Dinghy Slide]], [[Chairlift]], [[Cotton Candy Stall]], [[Miniature Railway]], [[Stand-Up Roller Coaster]], [[Popcorn Stall]], [[Pizza Stall]], [[Space Rings]], [[Virginia Reel]], [[Circus]]. If research spending is set to maximum it will take until August 3, Year 3 for all research to be completed.