Crumbly Woods: Difference between revisions

no edit summary
(Revised and added potential strategies for completing the scenario.)
No edit summary
Line 14:
 
Crumbly Woods is a park with a good groundwork for a park set up already, with good ride designs. But the rides are incredibly old! The average age of the rides in the park is about 13 years. Thus, they have low reliability and high down-time. So, this park is much more difficult than the other ones, but it can be beat by a very simple way.
 
If you keep the old rides it will get alot harder.
 
[[File:CarRide-CrumblyPark.jpg|thumb|The Crazy Critters ride ([[Car Ride]]) in Crumbly Woods]]
Line 86 ⟶ 88:
Crumbly Woods has one major problem, the rides are very outdated. The rides are old, unreliable, and don't bring in as much of a profit. You have three strategies to follow in this objective, you can either replace the old rides with new ones (demolishing all of the old rides), persevere with the old ones by building new ones, or remaking all the rides in their place.
 
First, you should pause the game. If you wish to place a gate fee, you may do so, but charge no more than $10.00 and adjust ride prices accordingly. Then you have to hire enough staff and set patrol areas. You will need lots of staff to keep the park clean, especially around the Whiplash, since the paths are very long and complicated (for handymen). Save the track designs of the two smaller roller coasters--Whiplash can be saved trouble-free, but Mean Squeak will require the underground sections to be demolished first. This won't work with Woodchip Woodchip, since it has too many underground parts. Even though you can just let them be, rebuilding the rides can allow you to make an incredible amount of money and attract far more guests with them.
 
After saving the track design of all the rides, unpause the game. First, demolish Crazy Critters at the back of the park. This ride is very problematic, because it's too long and the people who are on it just want to leave, and the people who are in the line for it just get angry. Be quick, and remake all the stalls and gentle rides. Now, make some benches and litter bins throughout the park. Renew the other roller coasters by using the track designs you saved. Last, destroy and reconstruct Woodchip Woodchip piece-by-piece or replace it with a custom roller coaster. It would be recommended to rebuild Woodchip Woodchip exactly as it was, because you may charge an admission as high as $6.00 if no gate fee is in place due to its very high excitement rating.
 
Now, it's time to construct some other rides throughout the park, mostly thrill rides to attract more guests. Build another path through the park to connect the entrance area with the fantasy-land, so your guests can walk in a circle. Add gentle and thrill rides along this path as you research them.
Line 195 ⟶ 197:
 
== Other Notes ==
This park has every original [[RCT]] ride available for research.
{{Succession|Pacific Pyramids|RollerCoaster Tycoon|Big Pier}}
[[Category:Scenario]]