Alton Towers: Difference between revisions

→‎Scenario Guide: Added details regarding station brakes failure crashes on Nemesis, Oblivion, and Black Hole.
(→‎Other Notes: So surprised nobody realized this.)
(→‎Scenario Guide: Added details regarding station brakes failure crashes on Nemesis, Oblivion, and Black Hole.)
Line 246:
*Everybody is getting lost;
*There are FAR too little shops & stalls;
*Nemesis, Oblivion, and Black Hole are extremely prone to station brakes failure crashes;
*There are FAR too little benches and trash bins, and a lot of the ones that are available for visitors to the park have been vandalized.
*Your initial loan is extremely high ($4 770 000!), so making money will be very difficult.
Line 256 ⟶ 257:
 
The fourth thing is to add a lot of shops and stalls. Maybe even a hundred. Make sure there are at least 25-30 Information Kiosks and Bathrooms scattered around your park, and at least 15-20 food and drink stalls. Also note that there is a pre-built Ice Cream stall in the park that is closed, and can be easily opened by opening all rides at the beginning of the scenario.
 
Remedying the fifth problem requires that each of the roller coasters be reduced to running only one train or that the tracks are redesigned so that the trains enter the station at a safe speed.  Nemesis can be reduced to run only one train without dramatically reducing capacity and profitability.  The same is also true of Black Hole if the 3-car rocket trains are swapped for a single 10-car ladybird or log train.  For Oblivion, the final stretch of the track after the curve to the station should be altered to include a holding brake; although this reduces the ride to running only two 3-car trains and requires that the trains be adequately spaced apart to avoid collisions, this fix makes the ride safe without significantly lengthening the track.
 
The final thing is to is to build benches and trash bins everywhere around your park.
Anonymous user